Record each weld as it is made
Link it to the procedure it follows, the welder who made it, and the heat and batch that went into it.
Weld Intra is welding management software for fabricators, welding contractors and their QA teams: for every weld it keeps the procedure, the welder, the materials, the inspections and the repairs.
Link it to the procedure it follows, the welder who made it, and the heat and batch that went into it.
Each weld keeps its number for good, as a row in the register and a pin on the exact revision of the drawing.
Its status, inspections and repairs are on one page, each with who recorded it and when.
Every weld on a fabrication job has a history: the drawing it is on, the procedure it was welded to, who welded it, the materials that went into it, its inspections and any repair. Weld Intra keeps that history weld by weld, in one place the whole team reads, instead of across spreadsheets and shared folders. It records what was done and what the documents say; the decisions stay with your people.
Drawing revisions with clickable weld maps: each weld is a numbered pin on the page it belongs to.
A weld register that keeps its history: a correction is a new revision, and the old one stays with who changed it and why.
Preliminary welding procedure drafts, printed in multiple languages and issued by a named person, with the qualification evidence from lab and coupon documents beside them.
Welder certificates and the welds each welder made, and the material heats, consumable batches and equipment service linked to the welds that used them.
Each weld's inspections and repairs, from the request to the retest, each entry open to a second person's review against its source.
A private file store with virus scanning, versions and previews, and a weld log and data book built from the records as they stand.
A correction is a new revision and the old one stays, with who changed it and why, so the record you hand over can be traced back to its first entry.
An inspection result is recorded with the original report as a file, and a second person can check the entry against it, so what the register says can be checked against the document it came from.
People set each weld's status and issue each procedure; Weld Intra records who and when and never decides for them, so every decision in the record has a name and a date.
The interface is in 21 languages, so each person reads the same record in their own.
Welding management
You are here Private betaInspection jobs and client delivery
Private betaThickness monitoring
Private betaScan planning
Private betaProbability of detection
Private beta